Player FMアプリでオフラインにしPlayer FMう!
India's maiden "Strategic Partnership Model" Submarine Building Programme - Project 75 (I)
Manage episode 298762727 series 2813232
In 1999, CCS cleared a 30-year submarine construction plan in which 24 Submarines were to be inducted into the Indian Navy by 2030. After a long delay, a contract was concluded with Mazagon Docks Ltd to construct 6 submarines in collaboration with Naval Group, France. Termed as Project 75 these Scorpene submarines started joining the Indian Navy in 2017. 3 Submarines have joined the force to date and 3 more shall be joining soon.
In Jun 2021, the DAC headed by Defence Minister Rajnath Singh has cleared another proposal to construct 6 more conventional submarines under the Strategic Partnership Model. To know more about this Project 75 I (India) submarines, we are joined with Cmde AJ Singh (Retd.) a veteran submariner in conversation with Captain DK Sharma (Retd.) of BharatShakti.in
Podcast Producer: Manas R. Tarai
90 つのエピソード
Manage episode 298762727 series 2813232
In 1999, CCS cleared a 30-year submarine construction plan in which 24 Submarines were to be inducted into the Indian Navy by 2030. After a long delay, a contract was concluded with Mazagon Docks Ltd to construct 6 submarines in collaboration with Naval Group, France. Termed as Project 75 these Scorpene submarines started joining the Indian Navy in 2017. 3 Submarines have joined the force to date and 3 more shall be joining soon.
In Jun 2021, the DAC headed by Defence Minister Rajnath Singh has cleared another proposal to construct 6 more conventional submarines under the Strategic Partnership Model. To know more about this Project 75 I (India) submarines, we are joined with Cmde AJ Singh (Retd.) a veteran submariner in conversation with Captain DK Sharma (Retd.) of BharatShakti.in
Podcast Producer: Manas R. Tarai
90 つのエピソード
すべてのエピソード
×プレーヤーFMへようこそ!
Player FMは今からすぐに楽しめるために高品質のポッドキャストをウェブでスキャンしています。 これは最高のポッドキャストアプリで、Android、iPhone、そしてWebで動作します。 全ての端末で購読を同期するためにサインアップしてください。